Jul 29, 20211 min read
Is this the same house?
Things finished up this week with final paint and trim work followed by a good cleaning. We've started to bring our old furniture back...
VANCURA KITCHEN REMODEL
Things finished up this week with final paint and trim work followed by a good cleaning. We've started to bring our old furniture back...
It's been a week since we've posted. Since then we've had tile installed on the backsplash, plumbing finished, and flooring installed!...
The countertops were installed yesterday morning followed by the range hood insert (after this picture was taken). We can't stop walking...
Lots of detail work this week with crews working on trim followed by patching and painting the walls. The counter tops were templated...
Today was by far the most exciting day since we watched the walls open up. The cabinets were unboxed and installed! The design and...
Big week this week ... all inspections passed first try and drywall started today! There were a lot of incremental rough-in/inspection...
This week started plumbing, electrical, and HVAC rough-in. Plumbing and HVAC are done but the electrical was, well, messy. Being on a...
The second beam was installed today per the engineering letter. Here is the working diagram for the structural changes. Both beams are...
The first of the two beams was installed. It's something to watch these guys do precision work amongst a mess like this. The floor joists...
The rest of the structural materials were delivered yesterday and the crew is finishing up demo on the flooring. Plumbing was roughed in...
Today the crew poured the footing after the hole passed inspection. A garden hose and many bags of concrete got the job done. It was a...
Five days of demo are behind us and it feels like we're approaching the putting things back together phase. The crew is prepping for the...
The crew started later in the day today as they were waiting for a machine to help chip away at these floors that have been glued down...
The walls are open and the floor is stuck (and the floor they managed to remove looks like an old man or duck depending on who you ask)....
Here are some nice blurry pictures of our first day of demo! Around 9am the crew showed up and dumpster and port-a-john were dropped off....
The downstairs is empty and ready for demo day 1! The kids had fun drawing on the walls that are coming down. We found some OG floral...
After years of talking about it, we finally have a design for our new kitchen! We worked with a designer at Kitchen & Bath Galleries to...